|
Different Assembly Lines C.K.D Axle Line- Differential Case Line- Lift Cover Line, Center Housing Preparation, Center Housing Line, Gearbox Line P.K.D Plant Designing Construction: Assembly Room, Repair Shop, Testing System, Administrative Building, Electricity Supply System, Water Supply System, Heating System, Ventilation System Designing of Assembly Process Designing of Lines: Assembly Line, Painting System, Structure of Cranes, Length of Lines Chassis Line, Painting Room, Final Line Primary Washing, Detergent, Secondary Washing, Dryer, Paint, Furnace
Required machineries in C.K.D Lines Gearbox testing machine: used in gearbox line Hydraulic testing machine (chassis): used in center housing line Press machines: used in axle lines, differential case line, center housing and gearbox
|